Construction

ESB North Wall

Demolition and enabling works to clear site ahead of main project. The management, removal and disposal of asbestos containing materials in existing buildings. Decommissioning and removal of redundant structures and utilities. Following the completion of the Enabling Works we were retained by the Main Contractor (Metka) to carry out excavation, utilities and construction works: The […]

ESB North Wall Read More »

Alta Verde Cross Avenue

The Alta Verde development off Cross Avenue, Blackrock will consist of 3 apartment blocks and basement. On completion, the development will deliver 244 apartments and 71 underground carpark spaces. Hegarty Demolition Limited (HDL) were contracted by Lioncor to carry out the initial phase of the development works namely: Demolition of existing structures, site clearance and

Alta Verde Cross Avenue Read More »

Barnhill Road

This development site in Foxrock required a cost effective retaining structure on its South boundary. Through early engagement with the Client and their Engineers, we developed and costed an efficient scheme consisting of a top-down wall with unpropped, rock socketed King Posts and precast concrete wall panels.

Barnhill Road Read More »

Damastown

Diversion of a 300mm diameter HDPE watermain to facilitate the Church Fields Housing Scheme. Diversion route was approximately 800m in length. Works required reinstatement of roads, paths and cycle tracks.

Damastown Read More »

ESB Poolbeg

The scope of works was split into two phases, namely the Demolition Phase and the Enabling Works Phase. Phase 1 – Demolition Works Requirements Preparation and implementation of Construction and Demolition Waste Management Plan. Ecological baseline and wildlife protection plan. Demolition of four existing buildings. Asbestos removal. Site Clearance. Site Investigation and soil classification. Installation

ESB Poolbeg Read More »